Infrastructure. Run stable. Built transparently.
Current workloads run on rented infrastructure. In parallel, we’re building our own hardware platform (“The Beast”) for Q2 2026 — documented in the build log.
Hosted in an ISO-certified data center in Germany.
Target specs (own hardware from Q2 2026)
- CPU
- AMD EPYC 9005 • 64 cores
- RAM
- 128 GB DDR5 ECC
- Storage
- NVMe up to 10,000 MB/s
Principles
Hosting isn’t a “subscription product” for us — it’s engineering. You should understand what you’re buying and why it stays stable.
- • Capacity planning instead of overcommit marketing
- • Transparency: specs, roadmap, status
- • Security mindset (PGP, responsible disclosure)
- • Focus on performance & clean ops concepts
Early access
Want to be first in line? Send your use case + requirements. I’ll respond with a realistic plan.
Roadmap
Note: Specs refer to the target system (“The Beast”) planned for Q2 2026. Current workloads run on rented dedicated hardware. Changes will be communicated transparently in the build log.
Build Log: Building the Beast
Short technical updates — no marketing fog. Progress, decisions, lessons learned.
How to reach us for security topics — encrypted, clean, no drama.
A quick spec teaser — because numbers are sometimes the most honest language.
Why Wilken Hosting&Dev exists, what’s coming until Q2 2026 — and why we take infrastructure seriously.